conditions of contract:
part i--general
part ii--conditions of particular
application 1 volume 2 specification
(incl. list of drawings) 3 volume 3 form of tender andappendix thereto
form of tender security
bill of quantities
schedules of supplementary information 1 volume 4 drawings
6.2 tender documents shall include any addenda issued prior to theclosing date of tenders in accordance with clause 8 and any minutes ofpre-tender meetings issued in accordance with clause 16 of theseinstructions to tenderers.
6.3 further copies of the documents may be purchased by pre-qualifiedtenderers for a non-refundable fee as follows: (sketch)
6.4 sub-contractors, manufacturers, suppliers and others who requirecopies of the documents shall not request them directly from _____________but shall obtain them only from pre-qualified tenderers.
6.5 on return of the documents in an undamaged and useable condition,either as part of a tender or otherwise, within the specified time limits,the tenderer's pre-qualification fee will be refunded, as follows:
(a) tender submitted: _________________% refund of fee
(b) tender not submitted but ________________% refund of fee
documents returned prior to closing date of tender
6.6 the tenderer is expected to examine carefully all instructions,conditions, forms, terms, specifications and drawings in the tenderdocuments. failure to comply with the requirements of the instructions totenderers wi
【正 文】be at the tenderer's own risk. tenders which are notsubstantially responsive to the requirements of the tender documents maybe rejected.
6.7 the four volumes of the tender documents have been collated andbound by mechanical means and tenderers should check to ensure that theycontaina
【正 文】pages (which are numbered consecutively) and that allsupplementsreferred to are also included.7. clarification of tender documents
7.1 a prospective tenderer requiring any clarification of the tenderdocuments may notify ___________ in writing or by telex at the followingaddress: __________.
the employer or his agent _____________ will respond in writing to anyrequest for clarification which is received more than _____ days prior tothe deadline for submission of tenders. written copies of the response(including an explanation of the query, but without identifying the sourceof the inquiry) will be sent to all prequalified tenderers who have beenissued with tender documents.8. amendment of tender documents
上一页 [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] 下一页
Tag:招标合同,招标合同范本,工程招标合同,合同范本 - 招标合同
- 国际工程招标说明书格式(英文)
- › 国际工程施工合同(一般条款)
- › 国际工程招标说明书
- › 国际工程招标说明书格式(英文)
- › 国际工程承包合同
- 在百度中搜索相关文章:国际工程招标说明书格式(英文)
- 在谷歌中搜索相关文章:国际工程招标说明书格式(英文)
- 在soso中搜索相关文章:国际工程招标说明书格式(英文)
- 在搜狗中搜索相关文章:国际工程招标说明书格式(英文)